Eskom’s is inviting applications from unemployed South Africans with a Grade 12 OR N3 qualification to apply for their 2017 Maintenance Learnerships which will be based at its Kriel Power Station in Mpumalanga. The learnerships are open to all South African citizens who meet the minimum requirements (have a Matric / Grade 12 certificate OR
South African’s state-owned electricity generation and distribution company, Eskom, is inviting applications for their 2016 Learnerships in Measurement, Control and Instrumentation which will be based at its Koeberg Power Station in the Western Cape, South Africa. Applications are invited from unemployed South Africans with a Grade 12 / Matric, N3 qualification or an NCV Level
Do you have a Trade Test certificate? Are you looking for a learnership? Eskom is inviting applications for its 2016 Learner Plant Operator Learnerships which will based at its Gourikwa Power Station (Mosselbay) andĀ Ankerlig Power Station (Atlantis) in Western Cape from South African citizens with a Matric/Grade 12 or N3 qualification. The learnership programme will
Do you have a Matric/Grade 12 or N3 certificate? Are you looking for a learnership? Eskom is inviting applications for its Hydro Pumped Storage 2016 Learner Plant Operator Learnerships, which will based at various of its KwaZulu-Natal power stations for a duration of twelve months, from South African citizens with a Matric/Grade 12 or N3
South African electricity producer, Eskom, is inviting applications for its 2016 Electrical Learnerships / Apprenticeships from unemployed South Africans with a Technical Matric or relevent Nated (N) courses with will be based at its Operating Unit in KwaZulu-Natal. There are 93 spaces on the programme and learners will be trained to become qualified artisans in
South Africa’s power utility, Eskom, is inviting applications for its Matimba Power Station 2016 Fitting and Turning Learnerships which will based in Lephalale, Limpopo from South African citizens with a Matric/Grade 12 certificate or an N3 qualification. The programme will accommodate 7 candidates. Learners will receive monthly allowance for the duration of the programme. What
South Africa’s electricity producer, Eskom, is inviting applications for its 2016 Learnerships in Warehousing from young unemployed South Africans with a Matric / Grade 12 qualification in any stream. This learnership will accommodate about one hundred (100) learners across various Eskom locations throughout the country. A monthly learnership allowance will be paid for the duration
Eskom’s Lethabo Power Station in the Free State is inviting applications from young South Africans with a Matric or an N3 certificate to apply for their sixteen (16) learnership opportunities in Electrical, Mechanical and Control and Instrumentation trades for 2016. The learnerships will be based at Lethabo Power Station and learners will receive a market
Eskom’s Komati Power Station is inviting applications from young South Africans with a minimum of Grade 12/Matric qualification OR N3 qualification to apply for their learnerships in plant operations. Learners will be trained as Plant Operators within the Komati Power Station in Mpumalanga. What are the requirements? To be considered for Eskom’s learnerships, you have
Eskom’s Kriel Power Station is inviting applications from young South Africans with a minimum of Grade 12/Matric qualification OR N3 qualification to apply for their learnerships in the following fields: Mechanical (11 learners required), Riggers (6 learners required), and Instrument Mechanicians (3 learners required). What are the requirements? To be considered for Eskom’s learnerships, you